Database / Climate Finance Database / FP007 / esia_safeguards
esia_safeguards
Supporting vulnerable communities in Maldives to manage climate change-induced water shortages
| esia_id | canonical_project_id | esia_document_id | review_stage | safeguard_framework | safeguard_category | biodiversity_impact_flag | resettlement_required_flag | indigenous_peoples_flag | labor_risk_flag | mitigation_measures |
|---|---|---|---|---|---|---|---|---|---|---|
| GCF_FP007_ESIA_001 | GCF_FP007 | GCF_FP007_DOC_001 | completion | GCF Environmental and Social Policy | Category B | — | — | — | — | Environmental and social management measures inferred from project completion context: (1) Solar PV integration reduced water production costs by 30 percent, lowering fossil fuel dependence; (2) Managed Aquifer Recharge (MAR) designs developed for sustainable groundwater management; (3) Groundwater studies and GIS-based monitoring systems established for long-term resource oversight; (4) Integrated Water Resource Management (IWRM) approach applied across 4 systems; (5) Water and Sanitation Act established as regulatory framework; (6) Training courses embedded in Maldives National University for sustained local capacity; (7) Utility Regulation Authority capacity strengthened for ongoing oversight. Note: Original ESIA/ESMP and Funding Proposal Section G safeguard documents were not available in the local project package; the above measures are drawn from the Project Completion Summary context rather than a formal ESMP. |
Field Evidence
GCF_FP007_ESIA_001
GCF_FP007
GCF_FP007_DOC_001
completion
GCF Environmental and Social Policy
Category B
—
—
—
—
Environmental and social management measures inferred from project completion context: (1) Solar PV integration reduced water production costs by 30 percent, lowering fossil fuel dependence; (2) Managed Aquifer Recharge (MAR) designs developed for sustainable groundwater management; (3) Groundwater studies and GIS-based monitoring systems established for long-term resource oversight; (4) Integrated Water Resource Management (IWRM) approach applied across 4 systems; (5) Water and Sanitation Act established as regulatory framework; (6) Training courses embedded in Maldives National University for sustained local capacity; (7) Utility Regulation Authority capacity strengthened for ongoing oversight. Note: Original ESIA/ESMP and Funding Proposal Section G safeguard documents were not available in the local project package; the above measures are drawn from the Project Completion Summary context rather than a formal ESMP.